Products/Drilling Fluids/Pressure Transmission Testing System

Pressure Transmission Testing System

Mud–Shale Pressure Transmission Testing

Compares and evaluates drilling mud performance by measuring the delay factor — how much a mud slows the transmission of pressure into shale compared to pore fluid. A higher delay factor implies a longer safe open-hole time.

Delay FactorKey Result
WBM / OBMTest Fluids
1.5″ × 3″Standard Sample
1″ × 2″Alternative Sample
Download Brochure
Capable of performing:
Mud Pressure Transmission (MPT)
Delay Factor Measurement
Pore Fluid Permeability
Mud Filtrate Permeability
Mud–Shale Compatibility
Mud System Ranking
Time-Delayed Failure Risk
Safe Open-Hole Time
FEATURES

How the Test Works

  • Evaluates how effectively a mud slows down pore pressure build-up in shale
  • Sample permeability is first measured using the pore fluid
  • The pore fluid is then replaced by a water-based (WBM) or oil-based (OBM) mud, allowing a second permeability measurement
  • The delay factor is calculated as the ratio of pore fluid and mud permeabilities

Delay Factor

  • Characterizes how much the test fluid delays mud pressure transmission in shale compared to pore fluid
  • Delay factors for different mud systems can be compared directly for a relative ranking of performance
  • A higher delay factor implies a longer safe open-hole time
SPECIFICATIONS
Recommended Sample Dimensions
Standard size3″ length × 1.5″ diameter
Alternative size2″ length × 1″ diameter
OD to ID ratio3:1 (both sizes)
Test Fluids
Reference fluidPore fluid
Test fluidWater-based mud (WBM) or oil-based mud (OBM)
Measured Outputs
PermeabilityTo pore fluid and to mud filtrate
Key resultDelay factor (ratio of pore fluid to mud permeability)
APPLICATIONS

Applications

  • Evaluating mud compatibility and reactivity with shale
  • Comparing and ranking mud systems by their ability to delay mud pressure transmission
  • Assessing the risk of time-delayed shale failure and wellbore instability
  • Estimating safe open-hole time for a given mud system
  • Supporting mud selection alongside triaxial testing of the shale failure envelope

Background

Wellbore instability occurs immediately if an incorrect mud weight is applied and the stress state touches or exceeds the failure envelope, which triaxial tests characterize through cohesion (S0) and internal friction. Even with the correct mud weight, instability can still develop over time.

The pressure transmission test measures the tendency of a mud’s filtrate, applied at overbalance pressure, to invade the shale fabric and raise near-wellbore pore pressure (van Oort, 1994). As pore pressure rises, the effective stress moves toward the failure envelope until shear failure occurs — leading to hole enlargement, cavings at the shakers, and problems ranging from pack-off and overpulls to stuck drill string and casing.

Request a Quote

Product Brochure

Fill in your details to receive the product brochure.

Scroll to Top